Bird's Nest, National Stadium
Beijing · Olympic Park and the north · Palaces and monuments · about 1 h

The Stadium of the 2008 Games
The Beijing National Stadium, which everyone calls the Bird's Nest, was built for the 2008 Olympic Games. Construction began in late 2003 and ended in June 2008. The stadium can hold about eighty thousand spectators, and a little over ninety thousand with temporary seats. It cost about two billion three hundred million yuan, which is several hundred million euros. It hosted the opening and closing ceremonies, track and field, and the soccer final.
In the app, this story goes on for 6 parts, to read or listen to, with one voice for grown-ups and another for kids.
A Nest of Steel Beams
A bird's nest as big as a stadium, made with steel beams instead of twigs. That is the Bird's Nest of Beijing. It was built for the 2008 Olympic Games. Eighty thousand people can sit in it at the same time, as many as the people in a small town. When you arrive in front of it, you will feel very small.
In the app, this story goes on for 8 parts, to read or listen to, with one voice for grown-ups and another for kids.
The full stories, the audio, the offline map and the challenges for kids.